What We Do

Services

Every job we quote, from a single repair to a full custom build.

Home › Services

Everything we take on

Every job below is one we do ourselves across West Allis.

Deck Installation

We frame new decks with joists set 16 inches on center and footings poured below the frost line, which around here means at least 42 inches down. We use galvanized or stainless hardware throughout, because regular fasteners rust out from the inside before the wood even shows wear.

Custom Deck Design

We'll walk your yard with you and talk through where the sun hits in July, where the grill should sit, and where you want a landing for stairs down to the lawn. The design accounts for your lot's slope and drainage before we ever cut a board.

Deck Repair

Soft spots in the decking, a railing that's started to lean, a ledger board pulling away from the house, we see all three regularly. We replace what's actually rotted instead of the whole structure, unless the framing underneath has gone soft too.

Deck Staining & Sealing

We pressure wash the boards, let them dry fully, then apply a penetrating stain that soaks into the grain instead of sitting on top like paint. Skipping this every two to three years is the single fastest way to turn a good deck into a gray, splintering one.

Composite Decking Installation

Composite boards like Trex or TimberTech don't rot or splinter, but they still need proper joist spacing underneath or they'll sag between supports. We install hidden fastener systems so the deck surface stays flat and screw-free.

Deck Replacement

When the framing's too far gone to patch, we tear the old deck down to the ledger board and rebuild from the footings up. Most of the time the posts and beams are the first things to go, long before the decking itself fails.

Deck Railing Installation

Railing has to meet code height and baluster spacing, usually 36 inches high with gaps no wider than 4 inches, and it has to hold up to someone leaning on it at a party. We set posts through the rim joist, not just screwed to the face board, because that's the difference between sturdy and shaky.

Multi-Level Deck Construction

Split-level decks need stair stringers and landings calculated for the grade of your yard, not a flat guess. We engineer the connection points between levels so the whole structure moves together instead of pulling apart at the seams.

Screened-In Porch Construction

We frame and screen in a porch off your existing deck so you get a bug-free space without losing the outdoor feel. The roof pitch and drainage get planned before framing starts, so water doesn't pool against the house.

Pergola Installation

A pergola gives you shade over part of the deck without blocking the whole yard view. We anchor the posts into the deck framing itself or into their own footings, depending on what the existing structure can carry.

How It Works

Four steps, and no surprises in any of them.

01

We come and look

You tell us what you want doing, we look at what is actually there, and we ask the awkward questions early.

02

You get a price

In writing, itemised, free. If something might add cost later we flag it now rather than at the end.

03

We do the work

Same crew throughout. We cover your floors, keep the dust down and tidy up before we leave each day.

04

We walk it with you

You point out anything you are not happy with and we fix it before the invoice, not after.

Where We Work

All of this, across West Allis, WI

Deck work across the greater Milwaukee area.

West Allis, WI
Milwaukee, WI
Racine, WI
Waukesha, WI
Wauwatosa, WI
New Berlin, WI
Brookfield, WI
Oak Creek, WI
Franklin, WI
Muskego, WI
Greenfield, WI
Common Questions

Things worth asking

Questions that come up once a project is underway.

Do I need a permit to build a deck?
Most municipalities in the Milwaukee area require a permit for any deck attached to the house or built more than 30 inches off the ground. Permit applications typically include a site plan and footing details, and the contractor usually pulls the permit as part of the job.
How long does it take to build a deck?
A standard single-level deck of 300 to 400 square feet usually takes 5 to 10 working days from footings to finished railing, weather permitting. Multi-level decks or screened porches add extra days for framing and roofing.
Can you work within a set budget?
Deck size, footing count, and material grade can all be adjusted to fit a target budget, and pressure-treated pine costs significantly less than composite boards. A clear budget discussed upfront lets the design get scaled to match it instead of guessing after the fact.
Is there a guarantee on the work?
Workmanship is typically covered for one to two years depending on the scope of the project, and materials like composite decking often carry their own manufacturer warranty of 25 years or more. Written warranty terms should be included with the final quote.
Who do I deal with during the project, the owner or a project manager?
A single point of contact, usually the person who quoted the job, handles scheduling and questions throughout the build rather than passing the homeowner between different staff.
What decking materials do you use?
Pressure-treated pine, cedar, and composite boards like Trex and TimberTech are the three most common choices, each with different upfront costs and upkeep. Pine requires restaining every two to three years, cedar a bit less often, and composite skips that step entirely.
Can I still use my yard while the deck is being built?
The construction zone is limited to the immediate deck footprint, and most of the yard stays accessible during the build. Material delivery and footing excavation are the two stages that temporarily block off the most space.
What do I need to do to prepare the site before work starts?
Clearing furniture, grills, and potted plants off the existing deck or patio area is the main prep needed before a crew arrives. Underground utility lines get marked ahead of footing excavation as part of the permit process.
What happens if you find rot or damage once the old deck comes down?
Hidden rot in ledger boards, support posts, or the house's rim joist sometimes turns up once old decking is removed, and that gets flagged before any new framing goes over it. Work stops until a revised quote covering the additional repair is written up and approved.
How should I maintain a new deck after it's finished?
A wood deck should be cleaned and resealed every two to three years to keep water out of the grain, while composite decking mainly requires an occasional wash with soap and water. Keeping planters and grills from sitting directly on the boards long-term also prevents trapped moisture.

Not sure what you need?

Describe the problem and we will tell you what it probably is. No obligation.

Call (414) 710-0334